HVAC Systems

01

Air / Water-Cooled Chillers

A chiller is a specialized refrigeration system that removes heat from a liquid, such as water or a glycol mixture, and circulates it to cool equipment, industrial processes, or building air. Air-cooled chillers rely on surrounding air to cool the condenser, while water-cooled chillers rely on water for efficient condenser cooling.

STUMKETECH Engineering Company limited offers the following services:

  • →System sizing and load calculation
  • →Supply, installation, testing and commission of chiller units
  • →Preventive maintenance schedules
  • →Fault diagnostics and corrective maintenance
Project Image 1
Project Image 2
Project Image 3
Project Image 4
VRF Maintenance
VRF Pipes
VRF Circuit
02

VRF / VRV systems

This efficient, modular commercial HVAC system distributes refrigerant instead of water from the outdoor unit to multiple indoor units, enabling users to independently control their specific room temperatures.

STUMKETECH Engineering Company limited offers the following services:

  • →System sizing and load calculation
  • →Supply, installation, testing and commission of VRF / VRV units
  • →Preventive maintenance schedules
  • →Fault diagnostics and corrective maintenance
03

AIR HANDLING UNITS

This is an essential HVAC component that conditions and distributes air throughout a building. It draws in a mixture of fresh outdoor air and recirculated indoor air, lowering carbon dioxide levels while passing the airflow through filters to remove dust, allergens, and pollutants. Passing over integrated heating and cooling coils linked to external chillers or boilers, the air is adjusted to the target temperature before being delivered to designated spaces.

STUMKETECH Engineering Company limited offers the following services:

  • →AHU selection, sizing, and supply
  • →Ductwork design and fabrication
  • →AHU Installation, testing and commisioning
  • →Preventive maintenace of AHU
  • →Electrical and Mechanical Repairs
AHU Maintenance 1
AHU Maintenance 2
AHU Components
AHU Unit Exterior
P

FROM PROJECT BRIEF TO COMMISSIONING

01

Site Assessment

We evaluate your facility's load requirements, existing infrastructure, and ambient conditions before recommending any solution.

02

Engineering Design

Our engineers produce full system designs with load calculations, equipment schedules, and layout drawings tailored to your project.

03

Supply & Procurement

We source equipment from trusted global brands — ensuring the right specification, lead time, and project budget alignment.

04

Installation

Experienced installation teams execute the work to manufacturer standards, with health, safety, and site cleanliness throughout.

05

Commissioning & Handover

Every system is tested, balanced, and verified before handover — complete with O&M manuals and performance reports.

06

Ongoing Maintenance

Structured preventive maintenance plans keep your system performing at peak efficiency — year after year.